2016-CSP-DPL-85 Circuit 6736 Dupont Seaford-Laurel Rebuild

AUI replaced 100 structures on the Dupont to Seaford rebuild while removing existing steel lattice towers and wood poles, installing drilled pier foundations in sandy and wet soil up to 10’x40’.Followed by new structure heights reaching up to 140ft with new conductor and O.P.G.W.

This project required extensive coordination due to security and safety at a sensitive chemical site and was awarded to AUI on a compressed schedule that was successfully met, reducing costs to the customer while maintaining a 24-hour restoration window for the majority of the project.