2016-CSP-DPL-10 6738 Bridgeville –S Harrington Rebuild Kratz section.

Install Seeco Switches, Poles and rebuild/demolish switches and poles at DEC’s Kratz substation to prepare for the Bridgeville – S.Harrington Rebuild.

 

DSCN1669 DSCN1725 DSCN1732 DSCN1733 DSCN1740